"Our Commitment is to Quality"

Cloudbreak Minesite

RTW supplied, fabricated, undertook surface treatment and delivered seven fuel and oil reel stations and associated pipework for Kerman Contracting Pty Ltd on Fortescue Metals Group's Cloudbreak Minesite in February 2014.
 
Fabrication complied with “Construction and Assemble AS 4100” with piping to 3992. All piping required hydro testing, internal cleaning and preserving. The racks were fully assembled including fitting of flow metres and filters ready for on-site commissioning.

Perth Airport Extension

Supplied, fabricated and surface treated the structural steel pipe walkway trusses for the Perth Airport Extension for construction and engineering company Civmec in May 2014.
 
Trusses were fabricated using 90mm pipe and involved many intricate joins and connections.

Bunbury Port Authority

Supplied, fabricated, carried out hot dip galvanising and delivered to site structural steelwork for silo Supports and gantries for construction and engineering company Ahrens at Bunbury Port Authority in November 2013.
 
The heavy structural, fabricated project was completed in a tight timeframe, before schedule and was assembled on-site without modification.

Wesfarmers LNG

Fabricated steelwork, all pipework including supports, installed, tested and commissioned Kleenheat Gas LNG refuellers and minesite storage and vaporisation project at Tuckabianna Minesite in September 2013.


Murrin Murrin Nickel and Cobalt Mining and Refining project

Supplied, fabricated, surface treated and delivery of structural steelwork for tank platforms, access platform and agitator skid for Minara Resources at its Murrin Murrin nickel cobalt operation in April 2013.

Laminex Group

Supplied, fabricate, carried out hot dip galvanising and delivered structural steelwork for the cyclone access tower, cyclone support structure and the flaker shed platform for Brightwater Engineering in September 2013.
 
Supplied, fabricated, surface treated and on site erection of structural steelwork for the separation tower in September 2013.

V&V Walsh Meat Processors

Supplied, fabricated, surface treated and installed building extension and support steelwork at V & V Walsh Meat Processors in January 2011 and March 2014


Monadelphous Group

Supplied, fabricated, surface treated and delivery of stainless steel chute and supporting assembly in July 2013.